Project Information
Construction of 750m3 ground reservoir for MAISAT pumping station in Wazzani village, South Lebanon.
The scope of work included:
- Demolition of an old 500m3 ground reservoir
- Construction of new 750m3 ground reservoir with all the required civil, mechanical and electrical works.
- Construction of DN 700 piping system and valves chambers with all the required accessories for the newly constructed reservoir and the existing one.
The scope of work included:
- Demolition of an old 500m3 ground reservoir
- Construction of new 750m3 ground reservoir with all the required civil, mechanical and electrical works.
- Construction of DN 700 piping system and valves chambers with all the required accessories for the newly constructed reservoir and the existing one.
Date of works: 2021-2023
-
Construction Date: 2021- 2023
-
Location: MAISAT, Lebanon