Project Infomation
Installation of steel pipeline of around 11,000 meters for X65 steel pipes of diameters ranging from DN 2000 to DN 900, of thicknesses ranging from 12.5mm to 7.2mm. Works include welding of all joints, 100% Ultrasonic testing of joints which had a success rate of 100%. Works also include complete fabrication of steel elbows, reducers, flanged pipe outlets, flanged pipe segments, and end caps.
-
Construction Date: 2018 - Ongoing
-
Location: South Lebanon