HYDRO AGRICULTURAL DEVELOPMENT OF SOUTH LEBANON IRRIGATION AND WATER SUPPLY SCHEME CONVEYOR 800 – MAIN AND SECONDARY CONVEYOR – FIXED PIPELINE PART

Project Infomation

Installation of steel pipeline of around 30,500 meters for X65 steel pipes of diameters ranging from DN 2000 to DN 1600, of thicknesses ranging from 17mm to 10mm. Works include welding of all joints, 100% Ultrasonic testing of joints which had a success rate of 100%, as well as 100% successful hydrostatic testing of the pipeline. Works also include complete fabrication of steel elbows, reducers, flanged pipe outlets, flanged pipe segments, and end caps.
  • Construction Date: 2014 – 2018
  • Location: South Lebanon