HYDRO AGRICULTURAL DEVELOPMENT OF SOUTH LEBANON IRRIGATION AND WATER SUPPLY SCHEME CONVEYOR 800 – Litani River Crossing Part

Project Infomation

Installation and welding of around 40 meters long Steel Pipeline of pipes of a thickness of 16mm, with diameters ranging between 2645mm and 2232mm inside a steel bridge over the Litani River along with welding of 40mm thick puddle flanges.
  • Construction Date: 2015 - 2016
  • Location: South Lebanon