GREATER BEIRUT WATER SUPPLY PROJECT – DAMOUR RIVER CROSSING PART

Project Information

Fabrication and Installation of 66 meters, 2800mm diameter river crossing penstock, composed of L275 rolled steel plates of 16mm thickness on the Damour Riverbed. Works include complete assembly, longitudinal and circumferential welding of all joints, as well as 100% Ultrasonic testing of joints which had a success rate of 100%. Works also include fabrication of steel supports for the pipeline as well as steel end caps for hydrostatic water pressure testing with all accessories.
  • Construction Date: 2016
  • Location: Damour, Lebanon